Daily planning for concrete crews: the plan in your head is a hazard

When tomorrow lives in the owner's head, the boys find out on the fly. And blokes finding things out on the fly is exactly how people get hurt.

Guides

Daily planning for concrete crews usually means this: the whole of tomorrow lives in the owner's head, and it comes out in fragments. A text at 8:30pm with an address. A call at 5am moving the start. The boys find out the details on the fly. And blokes finding things out on the fly is exactly how people get hurt.

This isn't an admin gripe. It's a safety problem wearing an admin costume, and it deserves the same respect you'd give bad ground or a dodgy hose.

Rushed is where it goes wrong

Think about what missing information does at 6am. Access wasn't checked, so the truck's set up in the wrong spot and now the boom's reaching further than anyone planned. Nobody mentioned the powerlines on the neighbour's side. The ground the builder swears will hold has never been looked at in daylight. Concrete's booked for seven, you rolled in at ten past six, and now everything happens at a run.

Rushed setups are where this industry hurts people. Not because blokes are careless — because they're compensating for information that should have arrived the night before. Every unknown at 6am becomes a shortcut at 7. Every shortcut is a roll of the dice with someone else's fingers on the table.

The five-minute brief

The fix costs five minutes each arvo. Before knock-off, tomorrow gets written down in one place: which jobs, which addresses, who's going, start times, what gear, how many cubes, what's confirmed, what's still missing, and who has to be called before dark to fix the missing bits.

Then the boys get it the night before. Not fragments — the picture. Where, when, what, and anything ugly: tight access, dodgy ground, long line, live traffic. A linehand who knows what he's walking into stands in a different spot to one who's guessing.

Missing info is a hazard — treat it like one

You'd never set the outriggers on ground you haven't looked at. Apply the same standard to information. Should-be-right is not a plan. If access isn't confirmed, that's a hazard. If nobody knows where washout's going, that's a hazard with a fine attached. Chase it the day before, when it's a phone call — not on the morning, when it's a drama with an agi burning waiting time behind it.

33 Rules Built Under Pressure says set up like your life depends on it, because it does. But the setup doesn't start when the legs go down. It starts the afternoon before, when someone bothered to find out what the job actually is and told the crew.

Five minutes of planning each arvo. One written plan. The boys briefed before dark. It's not paperwork. It's the cheapest safety gear you'll ever own — and it happens to make the business run like it's had a coffee.

Advertisement

This space for rentYour business here.Advertise with PumpLife

PumpLife

Whinge to the editor.

A tip-off, a question, a whinge or a yarn. Tell us as much or as little as you like.

What is it?
Leave your details (optional)

Leave this blank and the message is anonymous.

An email, a phone number or an Instagram handle.

We do not record who you are unless you tell us.