Guides

Concrete Pump Hand Signals: The Operator's Field Guide

Guides

Site noise + line-of-sight gaps mean hand signals are how the crew communicates on a live pour.

The ten core signals:

  1. Start pumping — closed fist, thumb extended, small circles.
  2. Stop pumping — flat open hand, palm out, held still (universal stop).
  3. Slow down — palm flat, facing down, lowered slowly.
  4. Speed up — palm flat, facing up, raised slowly.
  5. Reverse (suck back) — index finger, small backward circles.
  6. Boom up — thumb up, arm overhead.
  7. Boom down — thumb down, arm below.
  8. Boom left / right — arm extended in desired direction.
  9. Fold / pack up — arms crossed in an X.
  10. Washout — circular scrubbing motion at chest height.

Rules: one signaller only (usually the placer); operator must see the signaller (stop & reset if line-of-sight lost); never signal from behind the pump. Emergency stop: both hands up, palms out, overhead = stop everything (blowout, rupture, fall, electrical contact). Agi-driver signals: keep coming (come-here wave), stop (flat palm), cut left/right (point), straighten up (palms apart), that'll do (chop at neck). When signals fail: stop the pump, walk over, talk it out. New pumpys: learn the 10 before day one, use big slow signals, never turn your back to the operator.

Advertisement

This space for rentYour business here.Advertise with PumpLife

PumpLife

Whinge to the editor.

A tip-off, a question, a whinge or a yarn. Tell us as much or as little as you like.

What is it?
Leave your details (optional)

Leave this blank and the message is anonymous.

An email, a phone number or an Instagram handle.

We do not record who you are unless you tell us.