A 6-cube footing books the same truck, setup and washout as a 60-cube slab. If your minimum doesn't cover the day it wrecks, small pours are eating you.

Guides

The 6am call always sounds harmless. "Just a little one, mate — six cube, house footings, in and out in an hour." There's no such thing. A concrete pump minimum charge exists because small pours cost nearly as much to do as big ones — and handled wrong, they cost you more.

The little jobs don't look dangerous. That's what makes them dangerous.

A small pour books the whole truck

Same pre-start. Same travel. Same setup, same line on the ground, same washout at the end, whether six cube goes through or sixty. On a small pour, the pumping is usually the shortest part of the day. Everything wrapped around it is identical to a job worth four times the invoice.

And the little morning job never stays little. The concrete's late, the access is tighter than promised, the footings turn out to need another agi. Now it's dragged into your afternoon booking and wrecked a pour that was actually worth money. You didn't do a small job. You did a small job and cancelled a big one.

What the minimum has to cover

Work it off your break-even, not the going rate. Travel both ways. Setup and pack-up. Washout. A minimum block of hours. And the hard truth that the truck usually can't earn anywhere else for that half-day — the small pour didn't buy an hour of your machine, it bought the slot.

If your minimum doesn't cover a genuine half-day of your real costs, it isn't a minimum. It's a discount with a nicer name.

The $800 regular that isn't regular money

Set-rate regulars look like stability from the outside. Five little jobs a week, same builder, close to home, money you can count on. But if each one chews up most of a day, wrecks the next booking, or can't be handed to another pump because the rate's too skinny for anyone else to touch — that's not a good client. That's a habit. And habits are dangerous when they look like stability.

Run the real numbers on your best regular. Some blokes discover their most loyal client has been quietly gutting the business for years, one comfortable little pour at a time.

Price small work properly or let it go

There's nothing wrong with small pours. Priced right, they can be the best money per cube you make all week — quick, clean, paid on the day. The problem was never the size of the job. It's the size of the charge.

You don't have to hate the client. You just have to know the real cost before you call it a win. If a proper minimum makes them walk, the job was never paying you. You were paying it.

Advertisement

This space for rentYour business here.Advertise with PumpLife

PumpLife

Whinge to the editor.

A tip-off, a question, a whinge or a yarn. Tell us as much or as little as you like.

What is it?
Leave your details (optional)

Leave this blank and the message is anonymous.

An email, a phone number or an Instagram handle.

We do not record who you are unless you tell us.